Skip to main content

The Decksmith

NewTechWood Composite Decking

NewTechWood UltraShield is a fully-capped co-extruded composite — the polymer skin wraps the board 360 degrees, which is what makes it hold up to Eastern Suburbs salt air and hard morning sun without the ongoing oiling timber needs. On a recent 14-metre job I built a continuous run in NewTechWood Silver Grey. Every metre personally designed and built.

Request a consultation for your composite deck — 0468 486 290

Technical Specifications

Stage 1 — Before & Delivery

The starting point and the material landing on site.

Before — the existing setup I started from.
Before — the existing setup I started from.
Delivery day — NewTechWood Silver Grey on site.
Delivery day — NewTechWood Silver Grey on site.
Tools out, planer somewhere — getting set up.
Tools out, planer somewhere — getting set up.

Stage 2 — Strip-out & Framing

The old frame was the real work. Four days lifting, pulling nails, planing and levelling. My takeaway: it’s almost always more cost-effective to rebuild a frame from scratch than to massage an old one back to glory.

Four days of pulling nails to assess the old frame.
Four days of pulling nails to assess the old frame.
Joists taped up — protection before anything goes back on top.
Joists taped up — protection before anything goes back on top.
Frame adjustments to get the levels right.
Frame adjustments to get the levels right.
Level and string line — a Decksmith's best friends.
Level and string line — a Decksmith's best friends.

Stage 3 — Decking

On long continuous NewTechWood runs the lines have to be laser-straight. I string-line every few rows — skip it and the eye catches any skew the moment you walk the deck. The grain feels softer underfoot than most composites I’ve used.

Let the decking begin.
Let the decking begin.
Long runs need perfect lines.
Long runs need perfect lines.
Track cuts done — clean edges on the long run.
Track cuts done — clean edges on the long run.
The runway — 14 metres of continuous Silver Grey.
The runway — 14 metres of continuous Silver Grey.

Stage 4 — Stairs, Glass & Finish

Custom stairs and integrated frosted privacy glass to finish the surround. NewTechWood’s slip resistance and chlorine/saltwater tolerance suit poolside down to the structure.

Custom stairs going in.
Custom stairs going in.
New steps and frosted glass going in.
New steps and frosted glass going in.
Frosted glass for privacy without losing the light.
Frosted glass for privacy without losing the light.

The Finished Deck

The state of play — NewTechWood deck.
The state of play — finished NewTechWood deck.

Other Eastern Suburbs NewTechWood Projects

A few more NewTechWood builds across the Eastern Suburbs — different sites, same capped composite holding up to coastal conditions.

NewTechWood Teak deck with privacy screen, stainless cable balustrade and pergola.
NewTechWood Teak deck with privacy screen, stainless cable balustrade and pergola.
Coastal NewTechWood deck build.
Coastal NewTechWood deck build.
NewTechWood deck, Eastern Suburbs.
NewTechWood deck, Eastern Suburbs.
NewTechWood deck, Eastern Suburbs.
NewTechWood deck, Eastern Suburbs.
NewTechWood with integrated privacy screening.
NewTechWood with integrated privacy screening.
NewTechWood composite deck in a Coogee backyard, Eastern Suburbs Sydney
NewTechWood deck, Eastern Suburbs.

Contractor's Take

The brochure sells NewTechWood as bulletproof and low-maintenance. What it doesn’t tell you is how unforgiving a composite board is when the framing isn’t flawless. On this 14-metre job the client wanted to keep the old timber frame — four days lifting, planing and levelling later, I’d rebuild from scratch next time, every time. On runs this long the lines have to be laser-straight, so I string-line every few rows. The payoff is real: the anti-fade holds, and the grain has a softer feel underfoot than most composites on the market.

Why NewTechWood

Why Choose The Decksmith for Your Composite Deck Project?

Bronte blocks are rarely flat, rarely easy to access, and almost always have some combination of slope, retaining wall, existing paving and coastal exposure that has to be worked with, not against. This project is a case study in that. Curving the deck to mirror the paving, sealing every frame cut for salt-air longevity, hiding the bin run, and building the stair sequence to make the climb feel deliberate — these are the moves that suit a tightly considered Eastern Suburbs property where every square metre has to do work.

15+ years building across Bronte, Bondi, Coogee, Double Bay, Randwick and the surrounding Eastern Suburbs. I know the access, the council standards, and what coastal exposure does to a frame that has not been properly protected.

What Clients Are Saying

Five-Star Reviews From Sydney Homeowners

★★★★★ Verified Google reviews ★★★★★

"Greg was an absolute professional from start to finish. His flexibility, attention to detail & problem solving is a credit to him & his team. We couldn’t be more thrilled with the end product. I highly recommend Greg to anyone wanting a high quality deck."

— Chris P
Responsiveness · Punctuality · Quality · Professionalism · Value

Ready to Plan Your Composite Deck?

If you’re planning a NewTechWood deck in the Eastern Suburbs, I’ll help you get the structure, lines and finish right. — Greg, 0468 486 290

Lic. 272840C