Skip to main content

The Decksmith

Matraville Split-Level Millboard Deck — Built Low, Built for a Spa

A two-level Millboard deck in a Matraville courtyard, built on Lowdeck framing over rocky, slow-draining ground, with dedicated framing under the spa position and a running step tying both levels into the existing entry steps.

MaterialMillboard Enhanced Grain — Coppered Oak
SubframeMillboard Lowdeck — H4-rated specialty framing
Size46 m²
LevelsTwo, with boards running in opposing directions
GroundRocky and slow-draining — excavated first for ventilation
DetailRunning step joining both levels into the existing entry steps
SpaAdditional framing built to carry it. Spa supplied and installed by others
BuiltMay – June 2023
BuilderGreg, owner-builder. NSW Lic. 272840C

How It Came Together

The Site. A courtyard in Matraville, closed in by fencing on two sides, with an existing tiled step down off the back of the house. Rocky ground underneath, and the kind of ground that holds water rather than letting it go. That one fact decided the whole build.

Why Lowdeck. Rocky, slow-draining ground gives you two problems at once. You cannot get consistent depth for conventional footings, and any moisture sitting under a deck has nowhere to go. Millboard Lowdeck answered both. It sits low and level over uneven ground without deep excavation for posts, and it is H4-rated — the treatment level built for ground contact and damp, which is exactly the environment a low deck lives in. I excavated the whole footprint first, before a single frame member went down, purely to open the ground up and let air move under the finished deck.

The Brief. The clients were having a spa installed and wanted the deck to work around it. They also wanted levels rather than one flat platform, with the boards running in different directions on each level so the two areas read as separate spaces without needing a rail or a screen to divide them.

Framing for the Spa. A spa full of water is a serious load, and it sits in the one spot for the life of the deck. I built additional framing under the spa position, well past what was required. Call it overkill. I would rather build overkill than underkill — you get one shot at what sits underneath, and nobody is lifting a spa off a deck later to fix a frame.

The Dry Fit. Every mitre and every cut-around was dry fitted before anything was fixed down. There are posts coming up through the deck area, and a cut-around that does not sit tight is the first thing anyone notices. Fit it dry, check it, then fix it.

The Running Step. The two levels are joined by a step that runs the full length of the height change rather than a single narrow tread, and it marries into the existing tiled steps off the house. The whole area reads as one connected space with full access across it — no pinch point where everyone has to queue up to move between levels.

The Finish. Picture-framed edges on both levels, mitred corners, and the board direction reversed level to level. From the house you read two rooms, not one deck.

Stage 1 — Excavation and Set-Out

The problem: rocky ground with slow drainage. Standing moisture under a deck is what kills a frame.

The move: excavate the footprint first, open it up, then set the perimeter out level over the top so air can move underneath.

Excavated courtyard in Matraville with perimeter framing set out over rocky ground before low deck construction
Matraville courtyard prepared for a low-clearance deck, excavated and levelled with weed matting laid

Stage 2 — The Lowdeck Subframe

Subframe: Millboard Lowdeck, H4-rated specialty framing.

Why: an ultra-low profile over uneven rocky ground, with the durability rating that ground contact and damp demand. Extra framing built in under the spa position.

Millboard Lowdeck H4-rated subframe laid out across a Matraville courtyard over excavated ground
Additional Lowdeck framing built under the spa position on a Matraville low deck
Split-level low deck subframe in Matraville showing the two levels and the change in board direction

Stage 3 — Dry Fit: Mitres and Cut-Arounds

The detail: every mitre and every post cut-around dry fitted and checked before a single board was fixed.

Millboard mitres and post cut-around dry fitted on a Matraville low deck before fixing
First level of Millboard decking laid over Lowdeck framing in Matraville
Millboard boards set out running in opposing directions across two levels of a Matraville deck

Stage 4 — Laying the Boards

Millboard Enhanced Grain in Coppered Oak, laid level by level, with the run reversed between the two so each area reads on its own.

Lower level of a Matraville Millboard deck with boards laid and the subframe still visible at the rear
Split-level Millboard deck in Matraville part way through board installation

Stage 5 — The Running Step and Two Levels

The move: a step running the full length of the level change, married into the existing tiled steps off the house. Full access across the whole area, no pinch point.

Millboard running step joining two levels of a split-level deck in Matraville
Picture-framed Millboard split-level deck in a Matraville courtyard
Mitred picture-frame border detail on a Millboard low deck in Matraville

The Result

Two levels, opposing board directions, picture-framed and mitred throughout, sitting low and ventilated over ground that would have destroyed a conventional frame.

Completed split-level Millboard Coppered Oak low deck in a Matraville courtyard with opposing board directions
Finished Matraville Millboard Coppered Oak deck viewed from the house, showing both levels and the running step

Why Choose The Decksmith for Your Matraville Project?

  • Ground Assessment First. I dig before I design. Rocky, slow-draining ground rules some framing methods straight out.
  • Low-Clearance Specialist. Millboard Lowdeck H4-rated framing where a standard frame has no business sitting close to damp ground.
  • Built Past the Minimum. Spa framing, spans, fixing centres — I build over, not under.
  • One Builder. I quote it, I design it, I build it. NSW Lic. 272840C.

What The Client Said

★★★★★

Greg took a concept of what we wanted and delivered more than we hoped for. We worked closely with him and he listened to us and we are ecstatic with what he created. Would highly recommend to anyone! Thanks Greg and team

— Gerry Flanagan

Verified Google review

Ready to Reclaim Your Backyard?

Contact The Decksmith today. Call or text 0468 486 290, or book a consultation.

Lic. 272840C